225.202 - Exceptions
(a)(2) A nonavailability determination is not required for construction materials listed in FAR 25.104(a). For other materials, a nonavailability determination shall be approved at the levels specified in 225.103 (b)(ii). Use the estimated value of the construction materials to determine the approval level.

225.206 - Noncompliance
(c)(4) Prepare any report of noncompliance in accordance with the procedures at 209.406-3 or 209.407-3 .